Gallery for mosaic artist Emily Tholberg
techniques
about the artist
contact the artist
links
home
daily news
Pagosa Springs News Summaries
Tuesday, September 7, 2010
Local News - Opinions & Editorials - Business & Real Estate - Friends & Neighbors - Arts & Entertainment - Sports & Recreation - Humor, Fiction, Poetry - Health & Environment - Religion & Philosophy 
Fosset Gulch Road Temporarily Closed
Ann Bond | 7/13/10
Back to the News Summaries
Five miles of the Fosset Gulch Road (Forest Road 613) will be closed to through traffic beginning Monday, July 26, 2010, to allow for pipeline construction and road reconstruction. The northern closure point will be located about two miles south of U.S. Highway 160, restricting access to the Bull Canyon Road (Forest Road 841) and the Fosset Gulch area of the HD Mountains.

The closure may extend to November 1, 2010, although segments of the road will be reopened as construction activities are completed. Traffic signs will be installed in the affected area to alert the public of closures and construction traffic.  Access to local residences and for emergency equipment will be provided.   
 
The work is authorized under special use permits issued by the San Juan National Forest to Fosset Gulch Pipeline Company LLC and Petrox Resources Inc. for construction and operation of a natural gas and a water pipeline within the road corridor, and road reconstruction and maintenance.

Following pipeline installation, the energy companies will reconstruct the Fosset Gulch Road to again accommodate passenger cars, and the road will be reopened to public use.  Petrox will be allowed commercial use of the road for gas-field activities and will be responsible for road maintenance associated with its activities. 

The work in Fosset Gulch is part of a larger project that will connect five existing natural gas wells to gas transmission pipelines in southern Colorado. 

For more information, please contact Walt Brown, 970 385 1372.
Visit the Pagosa Daily Post

 

Website content ©2006-2009 by Emily Tholberg
Website design ©2006-2008 by HudsonHudson

Website editor ©2009 Harriet Dubner

Home | Gallery | Techniques | About the Artist | Contact Us | Links

mosaics, mosaic murals, tile, tilework, bathrooms, sinks, vanity tops, ceramic tile work, mosaic murals, glass murals, glass mosaics, stone murals, stone mosaic art, custom mosaic work, tumbled glass, custom tilework, kitchen remodel, kitchen countertop, kitchen backsplash, backsplash, granite, marble, slate, travertine, custom natural stone, custom countertop, custom backsplash, natural stone backsplash, mosaic landscapes, tile landscapes, animal mosaics


Visit These Other Pagosa Daily Post Member Web Sites:
 
Parelli Horsemanship | Spa Motel | Master Carpenter | Hunting Supplies | SportsFusion | Colorfest | Plaza Liquor | VOIPO | TwinMountain | Pagosa Trails | SJDental | Pagosa Baking Co | Skywerx Internet Services | Pagosa Day Spa | Brian O'Donnell | OverlookSmall | Great Steakhouse | PSInnSuites | The Lift | Riverpointe | Goodmans